Wellcome to National Portal

প্রাণবন্ত সবকিছুই পানি থেকে সৃষ্টি করা হয়েছে - আল কুরআন (২১:৩০)

Main Comtent Skiped

Achievements

1. Secondary Towns Integrated Flood Protection (Phase 2) Project, Stef 2

2. Integrated Water Management Development Project (WAMIP)

3. Rebuilding work of Vent-1.52m x1.83m Regulator in Baghpani area of Karnahar Barobila project under Paba upazila of Rajshahi district during the year 2009-10 and 2010-11.

4. In the year 2009-10 and 2010-11 fiscal year, in the Yusufpur area, the river bank protection of 170 meters in the left bank of the Padma river, from 62.060 to km 62.230.

5. Under the protection of Godagari Dakbungla and Railway Bazar in the year 2009-10 and 2010-11 fiscal year, repairing and reconstruction work of arrow defense in the left bank of the Padma River at km2.33.34 kilometers from 32.131 km to Godjari Model Thana.

6. Rehabilitation of flood dam at 0.500 km along the eroded alignment of Rajshahi City Protection Dam during the year 2010-11.

7. Under the non-budget revenue of the year 2011-2012, river bank defense works in the left bank of the Padma river in Bagha upazila of Rajshahi district from 70.50 kilometers to 41.50 kilometers from 41.550.

8. In the year 2013-2014 and 2014-15, under the Rajshahi Paur division, Rajshahi City Corporation area is situated at the left bank of the Padma River at Bulanpur. It is from 5.570 km: 5.720. Total maintenance work of 150 meters is required.

9. Under the Rajshahi Poorer Division, Bapaubo, Rajshahi under the Rajshahi City Protection Project in the year 2015-2016, Mr. 7208.25m 7360.00 = 151.75m Reliable work of long-lasting damaged rescue work.

10. In the year 2015-2016 and 2016-2017 fiscal year, repair and maintenance work of damaged river bank damaged at a distance of 63.230 kilometers from 63.030 to 63.230 kilometers at Tangan on the left bank of Padma river in Charghat upazila of Rajshahi district.

11. Under 2016-17, under the Bamatira embankment project under Bagha upazila under Bagha upazila of Rajshahi district, the occupied portion of the existing defense work in Alaipur BOP area is 41.3650 Kms. 41.400 apart = 55 m pacing and Km 41.3800 Kms. 41.4125 = 32 Repair and maintenance work of .50 meters dumping work.

12. Rajshahi Cadet College and adjoining important project to protect the Padma river from the breakdown.

13. In the year 2015-16 and 2016-17, under the Rajshahi Paur division, the Chalan Bill project under Bagmara upazila of Rajshahi district is in flood control system of Polder-C: 128.412 km: 128.855 = 0.443 km: And what is: 129.885 km: 130.500 = 0.615 km: Total 1.058 km: Length of dam with repairs / repairs: 128.655 km: 128 .855 = 0.200 km: Mesh protective work.

14. In the year 2016-2016 fiscal year, Panchshati of Rajshahi City Protection Project under Rajshahi Poir Division, BPAUBO, Rajshahi, meters from 11.620 to 11.710 = 90 meters and meters 11.895 to 11.914 = 19 meters total = 109 meters. Repair and maintenance of damaged river bank maintenance.

15. Regarding repair and maintenance of T-Groen's main infrastructure under the Rajshahi Paur Division, BPAUBO, Rajshahi, in the year 2016-2017 and 2017-2018.

16. Repairing and maintenance work in the Sarengpur area under the construction of the dam from Rajabari to Baliaghata under Godagari upazila of Rajshahi district in the year 2016-2016, from 34.050 to km 34.28 up to 17.28 meters.

17 . Protection of Sonaikandi to Bolonpur area in Rajshahi City Corporation from erosion of Padma River (Implementation period: From July 2016 to June 2019).